Trench, Footpath and Road Reinstatement in Auckland: One Contractor, Boundary to Road

sp8002
Oct 29
4 min read

Updated: Nov 5

Rapidpatch reinstates the whole strip from your boundary to the road, concrete and asphalt, under one contractor. That means concrete footpaths, vehicle crossings and kerbs, the asphalt road edge, and the private driveway on your side of the boundary, under one price. We work under your corridor access approval from Auckland Council (Auckland Transport until 1 October 2026), book the inspections and the compaction test, and give you the A9 completion pack to lodge.

Most reinstatement jobs cross trades. A sewer or stormwater connection cuts through the driveway, the crossing, the footpath and the road. Each piece has its own material, its own inspection and often its own contractor. That is where jobs stall and where non-conformance notices come from. We run the whole strip.

What we reinstate

  • Concrete footpath reinstated to match the existing panel, joints and finish.

  • Vehicle crossings, repaired or rebuilt to the vehicle crossing standard, including an old crossing turned back into footpath and berm.

  • Kerb and channel where the trench or crossing has cut it.

  • Berm edge and the transitions between surfaces.

  • Road edge and carriageway in hot-mix asphalt (AC14), saw-cut and sealed.

  • Private driveway, concrete or asphalt, on your side of the boundary.

For drainlayers, builders and developers

Send us the CAR or Works Access Permit number, the mark-out or photos, the trench length and your connection date. We price both trades within one business day and give you a programme that fits your traffic management plan.

If your TMP covers the footpath and the lane, we work under it and you keep your own traffic management crew. If you need ours, we price stop/go as a separate line. Either way you deal with one contractor, not a concreter and a paver who blame each other at the inspection.

Got a non-conformance notice?

A non-conformance notice usually gives you a few working days to fix a reinstatement. Send us the notice, the CAR number and the photos the corridor inspector took. We'll tell you what the inspector is asking for and how fast we can programme it. Our guide to what to do in the first 48 hours after a non-conformance notice goes through it step by step.

How the job runs

  • Mark-out with the corridor inspector where they offer it. Price the marked area, not the photo area: the code trims every edge and extends cuts to a nearby joint or kerb.

  • Concrete first: boxing for the crossing and footpath, inspection before the pour where required, then the pour.

  • Cure while the base for the road edge is checked.

  • Compaction test (nuclear density meter) on the basecourse before surfacing. We book it.

  • Asphalt road edge, saw-cut and sealed.

  • Final inspection, then the A9 works completion pack: sketch, photos and test results for the CAR holder to lodge.

What's in the price, and what's a separate line

Corridor jobs blow out on the things nobody priced. We list them up front:

  • Area growth: the reinstatement code trims every edge and the 1 m rule extends the cut to a joint or kerb nearby. Marked-out areas often run 30–50% bigger than the photo suggests.

  • Depth: road asphalt is matched to the existing depth. Our price states the depth it assumes.

  • Base: whoever dug the trench usually owns the backfill and the base compaction. If the base fails the test, rework is priced before it goes ahead.

  • Compaction test, traffic management, and corridor compliance and A9 paperwork: shown as their own lines.

Guide prices, excluding GST: corridor reinstatement from $3,000 for a small job; concrete footpath and crossing $300–$450 per m²; road asphalt priced per m² for the depth. Our trench reinstatement cost guide has worked examples.

Damaged footpath: who pays to fix it?

  • Cracked or lifted by age or street-tree roots: Auckland Council. Report it, or call 09 355 3553 if someone could get hurt.

  • Damaged by a builder during a build: the builder or owner. Council inspects after completion and bills for damage; the $124 street damage fee is paid with the building consent.

  • Cut by a drain or service connection: the corridor access (CAR) holder, usually the drainlayer or developer. Utility reinstatement is warranted for 2 years.

  • Your old crossing is no longer needed: the property owner reinstates kerb, footpath and berm.

  • Your crossing is broken where it meets the footpath: the property owner, because the crossing is yours.

Builders: book the free pre-start meeting or take dated photos of the footpath before you start, because the council compares after completion. Don't repair the public footpath yourself: work in the road reserve needs council approval. If the council or a CAR condition says you have to reinstate it, we do the concrete footpath, the crossing and the road edge in one job.

Rebuilding a crossing as part of the job? See vehicle crossing approval, fee and inspections.

Frequently asked questions

Who pays for footpath reinstatement after a drain connection?

The party that dug it. Usually that's the drainlayer or developer holding the corridor access approval. They're responsible for reinstating the footpath, crossing and road to the code, and for any defects during the maintenance period.

Can you work under my CAR?

Yes. Most of our corridor work runs under the client's corridor access approval and traffic management plan. Send us the CAR or WAP number and its conditions and we fit the work into the approved dates.

Who lodges the A9 completion notice?

The CAR holder lodges it. We fill it in and supply the attachments (a sketch of the extent, photos and the compaction results), so you can sign and send it.

Do you supply traffic management?

We can, priced as a separate line, or you can use your own TTM crew if your plan covers our work. Many developers prefer their own.

How long before the footpath can be walked on and the crossing driven on?

Footpaths are usually open to foot traffic after a day or two. Vehicle crossings typically need 5–7 days before cars use them. We plan the sequence so access is closed for as short a time as possible.

Does Rapidpatch do concrete as well as asphalt?

Yes. Rapidpatch repairs concrete and asphalt driveways across Auckland, including vehicle crossings, broken slab sections, cracks and joints. Send photos for a price range the same business day.

Send the CAR number, the photos and your dates. One price for the concrete and the asphalt, within one business day. 027 737 2858 · fix@rapidpatch.co.nz

 
 
 

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page